Façade & at-height specialists · all 7 emirates +971 56 105 0735 WhatsApp

Glass Installation & Replacement

Facade Glass Installation and Replacement at Height

A cracked pane on the 30th floor is a safety risk and a leak waiting to happen. Your glass is made safe, measured, supplied and replaced from outside — without waiting for a cradle or closing the road.

  • IRATA / SPRAT-certified rope access technicians
  • Public liability insurance — AED 1,000,000
  • Written method statement & risk assessment with every quote
  • Free site survey within 48 hours across the UAE

Why it can't wait

  • Thermal stress and nickel-sulphide inclusions crack toughened glass without warning.
  • Cracked units leak, fog and fail insulation, pushing up cooling costs.
  • Delays waiting for cradle access leave the defect exposed for weeks.

What's included

  • Emergency make-safe and temporary protection
  • Site measurement and glass specification matching
  • Removal of damaged units and debris control
  • Installation of single, double-glazed and laminated units
  • Structural silicone and weather-seal application
  • Water test and handover report
Method diagram for glass installation & replacement: Make-safe film on cracked unit; Rope-access lifting from roof; Structural silicone + water test Glass unit exclusion zone roof anchors 1Make-safe film on cracked unit2Rope-access lifting from roof3Structural silicone + water test
How the work is done safely: independent working and backup lines from inspected roof anchors, with the ground below barricaded.

Who it's for

  • Residential and office towers
  • Hotels
  • Shopfronts and atriums
  • Skylights and canopies

Available across the UAE: glass installation & replacement in Dubai · glass installation & replacement in Abu Dhabi · glass installation & replacement in Sharjah · glass installation & replacement in Ajman, RAK, Fujairah & UAQ.

Request a free site survey

Reply within 2 working hours. Survey within 48 hours.

e.g. 050 123 4567 or you@company.com

Prefer WhatsApp? Message the team directly.

The method

Four steps from enquiry to sign-off

  1. 01

    Survey

    A technician visits within 48 hours, maps anchors and surfaces, and photographs every elevation.

  2. 02

    Fixed quote

    You receive a written price, method statement, risk assessment and programme — no vague 'from' pricing.

  3. 03

    Safe execution

    Two-rope access, ground exclusion zones, daily toolbox talks and a supervisor on every drop.

  4. 04

    Proof of work

    Before/after photo report per elevation and a sign-off sheet for your FM records.

Glass Installation & Replacement: common questions

How fast can a broken facade pane be replaced?

Make-safe is usually same or next day. Replacement follows once the matched glass unit is fabricated, which varies by specification.

Can you lift large glass units without a crane?

Many units are handled with rope-access lifting systems from the roof. Very large or heavy units are planned with the appropriate lifting equipment.

Related services

Get your building surveyed this week

A fixed written quote, method statement and programme — before anyone goes over the edge.